Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Oct 10, 2007     Smoke system - (1.1 hours)       Category: Fuselage
I prepped the aft baggage floor, the doubler plate, and the reservoir attach-angles for assembly, and prepped and primed the attach angles. Because the reservoir will sit flush on the floor, the blind rivets that attach the floor to the airplane might rub on the reservoir. I decided to try putting some washers under the angle pieces to lift them up far enough to clear the rivet-heads. (I ground them down enough to clear the nutplate holes.) In theory, this would work, but after thinking about it for a while, I realized this might put undue stress on the four small contact patches under the washers. Therefore, I'll simply countersink the floorboard and install flush blind rivets to attach it to the airplane. Problem solved.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.